Note
Access to this page requires authorization. You can try signing in or changing directories.
Access to this page requires authorization. You can try changing directories.
The RunOnceReportJobPeriodEnd property gets the concluding date of the period to be covered by a run-once report job.
C++
HRESULT get_RunOnceReportJobPeriodEnd(
DATE* pdEndDate
);
Parameters
- pdEndDate
Pointer to a DATE that is set on return to the value specifying the concluding date of the period to be covered by a run-once report job.
Return Value
This property method returns S_OK if the call is successful; otherwise, it returns an error code.
Visual Basic
Property RunOnceReportJobPeriodEnd As Date
Property Value
Date value that specifies the concluding date of the period to be covered by a run-once report job.
Remarks
This property is read-only.
For a run-once report job, the RunOnceReportJobPeriodStart and RunOnceReportJobPeriodEnd properties define the period. Both of these properties can be set using the SetAsRunOnceReportJob method.
Requirements
| Client | Requires Windows 7 or Windows Vista. |
| Server | Requires Windows Server 2008 R2 or Windows Server 2008 x64 Edition with SP2. |
| Version | Requires Forefront Threat Management Gateway (TMG) 2010. |
| IDL | Declared in Msfpccom.idl. |
| DLL | Requires Msfpccom.dll. |
See Also
Send comments about this topic to Microsoft
Build date: 6/30/2010